MHSC & general reports

Some final MHSC and other project reports.

Initially, I am only putting one here, namely the Dip Pillar project that has not been published and an unpublished consultancy report.

Brink, A.v.Z., Hagan, T.O., Spottiswoode, S.M. and Malan, D.F. (2000) Survey And Assessment Of Techniques Used To Quantify The Potential For Rock Mass Instability.  Safety in Mines Research Advisory Committee Final Project Report GAP608.

Spottiswoode, S.M., Napier, J.A.L., Milev, A. M. and Vieira, F.M.V.  (2000) The Relationship between ERR and seismic energy release for different geotechnical areas. Safety in Mines Research Advisory Committee Final Project Report GAP612c.

Spottiswoode, S.M. and Milev, A.M. (2002) A methodology and computer program for applying improved, inelastic ERR for the design of mine layouts on planar reefs. Safety in Mines Research Advisory Committee Final Project Report GAP722.

Cichowicz, A., Spottiswoode, S.M., Linzer,L.,  Drent, D., Heyns, P.S. and Handley, M.F. (2005) Improved seismic locations and location techniques, Safety in Mines Research Advisory Committee Project report: SIM 02 03 04

  Summary

  CSIR

  ISSI


Hildyard, M.W., Napier, J. A. L., Spottiswoode, S.M., Sellers, E., Linzer, L.M. and Kataka, M.O. (2006) New criteria for rockmass stability and control using integration of seismicity and numerical modelling, Safety in Mines Research Advisory Committee Final Project Report SIM 02 03 01.

Spottiswoode, S.M., Milev, A.M., Linzer, L.M. and Majiet, S. (2009) Evaluation of the design criteria of Regularly Spaced Dip Pillars (RSDP) based on their in-situ performance, Safety in Mines Research Advisory Committee DRAFT Final Project Report SIM 04 03 01 File

Spottiswoode, S.M. (2010) Time_of_day_seismicity_Mine_A.  File

Make a free website with Yola